Nepal

KATHMANDU, JULY 14 Work to repair the Jorpati-Sundarijal road will be completed by mid-December this year. The road, which is being widened, will later be blacktopped. Although efforts were being made since long to expand and blacktop the road, that could not be possible due to the resistance from some locals, Kathmandu Valley Road Expansion Project stated.

It added that the road would have a width of 12 metres at some locations and 20 metres at other places.

Project Chief Guru Adhikari said it had decided to blacktop all the dusty roads in Kathmandu valley which are currently under expansion phase. The Project was making the necessary preparations for widening the Jorpati-Sundarijal road even during the lockdown.

It has cut down 67 trees on either side of the road.

Locals and commuters have been facing problem as the road that was dug in the course of the widening work has been left unrepaired.

It has turned muddy and full of puddles amidst the monsoon rain.


A version of this article appears in e-paper on July 15, 2020, of The Himalayan Times. The post Jorpati-Sundarijal road to be repaired by mid-December appeared first on The Himalayan Times.





Unlimited Portal Access + Monthly Magazine - 12 issues-Publication from Jan 2021


Buy Our Merchandise (Peace Series)

 


Contribute US to Start Broadcasting



It's Voluntary! Take care of your Family, Friends and People around You First and later think about us. Its Fine if you dont wish to contribute and if you wish to contribute then think about the Homeless first and Feed them. We can survive with your wishes too :-). You can Buy our Merchandise too which are of the finest quality.


STRIPE





13